For the Flight Information Display System (FIDS) upgrade at Changi Airport Terminal 2, Fiber Tech Solutions laid 70 km of fibre optic cable and terminated 4,000 connectors on a single project.

The flight information displays across a terminal depend on a fibre backbone behind them. On this upgrade our scope was that fibre: 70 km of cable laid and 4,000 connectors terminated.
Airport terminal fibre work is not daytime office cabling. Our crews are trained and equipped for confined-space, trackside and live-tunnel environments and work night engineering hours across Singapore’s critical infrastructure, scoping access against what the site permits.
Fiber Tech Solutions owns and operates OTDRs and optical power meters for certification and fault-finding, so testing sits with the same team that installs. For a planned test pack — traces, loss tables and pass/fail against agreed limits — see OTDR testing and fibre certification.
Airport & critical infrastructure fibre. Fusion splicing & termination. OTDR testing & fibre certification. All services: services hub.
Planning terminal or airside fibre? Tell us the site and the fibre scope and we will come back with a work plan. Call +65 8055 9743 or send an enquiry.
From a single fiber joint to island-wide infrastructure — we would be glad to discuss your next project.
Email us